Skip to main content
Operator at a shielded X-ray cabinet, a BGA-populated board on the sample stage and a greyscale solder-joint image on the adjacent monitor

Quality · IPC acceptance criteria & measured yield

Judged by limits, not adjectives.

Every board passes three gates — IQC, IPQC then OQC — and each gate is judged against a published criterion rather than an opinion: IPC-A-610 Class 2 / Class 3 for appearance, IPC J-STD-001 for through-hole fill and wetting, IPC-7095 for BGA voiding. The limits themselves are set out below, and the two internal metrics we report carry their measurement definitions next to the number, so you can copy both into a supplier audit.

Six gates

Where a board can be stopped

  1. IQC — incoming

    Bare boards arriving from audited partner fabs, components and moisture-sensitivity status are all checked and recorded per lot before anything is issued to a line.

  2. IPQC — print and 3D SPI

    Solder-paste volume, height, area and offset are measured on every print pass, so a drifting stencil or a drying paste is caught before components go down.

  3. IPQC — post-placement AOI

    In-line optical inspection immediately after placement catches missing parts, offset, polarity and damaged bodies while the board can still be corrected cheaply.

  4. IPQC — post-reflow AOI and X-Ray

    After reflow, AOI looks at bridging, insufficient solder and joint appearance. Hidden joints under BGA, CSP and QFN packages get 2D X-Ray when the programme calls for it.

  5. Electrical test

    Bed-of-nails ICT, functional test benches, flying probe and boundary scan as the programme requires, plus temperature-controlled burn-in and Hi-Pot dielectric testing.

  6. OQC — outgoing

    Final inspection against the agreed IPC class, packing verification, and release documentation issued against the production lot before the carton is sealed.

What is measured

Inspection item by item, with the method

Inspection plan used on production lots
Stage and item Method and equipment Basis for acceptance
IncomingIQC Bare boards from audited partner fabs, components, and MSL status recorded at bag opening. Supplier certificate of conformance, plus dimensional and appearance checks to the drawing.
Solder paste3D SPI Volume, height, area and offset measured on an in-line 3D paste inspection system. The acceptance window for each metric is agreed per programme.
PlacementIn-line AOI Missing part, offset, polarity, bridging and insufficient solder detected optically after placement and again after reflow. IPC-A-610 Class 2 / Class 3, as specified on the order.
Hidden joints2D X-Ray BGA, CSP and QFN solder joints imaged through the package where a visual check cannot reach them. IPC-7095 voiding limits; X-Ray is configured per project.
Electrical test ICT bed-of-nails with in-house fixture design, functional test benches, flying probe, JTAG boundary scan, burn-in and Hi-Pot. Customer test specification and the approved test programme.
First articleFAI SPI and AOI data captured on the first article, with the appearance criteria it was judged against. IPC-A-610 Class 2 / Class 3 and the agreed drawing revision.

The limits

The numbers a nonconformance is decided on

Acceptance criteria applied on the floor

IPC-7095 BGA voiding — Class 2: individual void ≤25% of pad area, total voiding ≤40%; Class 3: individual ≤10%, total ≤25%. IPC-7095
Ionic cleanliness (ROSE, IPC-TM-650) — Class 2 ≤1.56 µg NaCl equivalent/cm²; Class 3 ≤0.78 µg NaCl equivalent/cm². IPC-TM-650
Through-hole fill and wetting per IPC J-STD-001 · rework and repair per IPC-7711/7721 · conformal coating per IPC-CC-830 · appearance acceptance per IPC-A-610 Class 2 / Class 3, applied by IPC-trained CIS/CIT personnel. IPC J-STD-001
Class is a decision, not a default: Class 2 and Class 3 assemblies differ in inspection effort, rework cost and documentation. Tell us which one your product is designed to, and the quotation is priced against it. Class 2 / Class 3

When something fails

What happens to a board that does not pass

Digital microscope inspection head over a green ESD bench mat, its ring illuminator lit and a magnified board image on the monitor

Contain, record, decide

A failed unit does not travel quietly down the line. The lot is held, the defect is classified against the criterion it breached, and the disposition — rework, repair, scrap or concession — is recorded against that lot with the reason. Nothing is released on a verbal decision, and nothing is quietly reworked without the record showing it.

Lot disposition
Hold, then rework, repair, scrap or concession
Rework and repair
Per IPC-7711 / IPC-7721
MSL exposure
Logged from bag opening; bake on exceedance
Packaging
ESD bag + MBB + desiccant + indicator card

Records follow the lot: production-lot traceability, the first article inspection report with its SPI and AOI data, and the buyer's right to audit written into the quality agreement. A question raised eighteen months after shipment can be answered from the file rather than from recollection.

Measured, with definitions

The internal metrics, each with the sentence that defines it

  • ≥98.5% First-pass yield

    First-pass yield measured at final inspection before any rework or retest, SMT + THT assembly, production lots; excludes pilot builds and post-ECN first articles.

  • ≥98.7% On-time delivery

    On-time delivery measured against the confirmed ship date at order acknowledgement, counted per shipment.

  • 1 Traceability level held: production lot

    Traceability is held at production-lot level, covering the process parameters and the component batches consumed by that lot.

  • 0 DPMO figures published

    We do not publish a DPMO figure. If your supplier audit requires an outgoing-defect number, we will agree the definition with you and report against it.

Both percentage figures are internal operating metrics, self-reported and not independently verifiable from outside; the definitions above are the measurement basis, and both can be written into a quality agreement.

Management systems

Six credentials, and what each one actually is

ISO 9001:2015

Quality management system · 2024

Scope: the quality management system covering SMT and THT assembly production services — the system that carries nonconformance, corrective action and management review.

ISO 14001:2015

Environmental management system · 2023

Scope: the environmental management system for SMT and THT production at this site, covering flux, solvent and solder waste handling and waste-stream recording.

ISO 13485:2016

Medical device QMS · 2021

Scope: production of PCBA. This is a QMS certificate for the production of PCBA — not an FDA clearance and not an EU MDR certificate. Device authorisation stays with the legal manufacturer.

IATF 16949:2016

Automotive QMS · 2024

Scope: manufacturing of circuit board components. Permitted exclusion: product design. PPAP documentation is prepared against this system where the programme requires a submission level.

RoHS 3 and REACH SVHC

Substance compliance · declaration, not a certificate

RoHS 3 to EU 2015/863 and REACH SVHC substance compliance are evidenced by declarations and test reports rather than by a certificate. Declaration and test reports available on request.

Conflict minerals — 3TG CMRT

Smelter disclosure · annual, not a certificate

The CMRT reports smelter and refiner sources for tin, tantalum, tungsten and gold in the parts we place. It is a disclosure document, not a certification of the finished assembly. CMRT available on request.

The questions we get asked

Six answers, including the ones that cost us something

Does an ISO 13485 certificate mean you are FDA approved?

No, and we will not write it that way. ISO 13485:2016 is a quality management system certificate for the production of PCBA — not an FDA clearance and not an EU MDR certificate. Authorisation to place a medical device on the market belongs to the legal manufacturer of that device; what we supply is the assembly, the lot traceability and the process records that support their submission.

Do you put a CE mark on the boards you assemble?

A subassembly sold to an equipment manufacturer for further fabrication requires no authorisation, and a bare assembled board is not a CE-marked product. The OEM branding the finished device is the legal manufacturer and carries the CE and FCC conformity obligations that go with that role. What we provide is the technical file input — BOM, material declarations, process records and test data — so the declaration you sign is supported by evidence from the build.

What is your minimum order quantity?

The minimum is driven by the component packages on the board, not by a single site-wide number. Chip passives from 0603 to 2225, and SOT, SOD and MELF packages, start at 50 pcs plus 30 spares. Every other package starts at 100 pcs plus 50 spares. Prototype quantities are quoted per order rather than forced into either band, because the reel and stencil setup differs from programme to programme.

Does every board go through AOI and X-Ray?

3D SPI and AOI are standard in-line configuration on the SMT process, so those two run as a matter of course. X-Ray is configured per project: it is specified where a board carries BGA, CSP or QFN joints that cannot be seen optically, and it is left out where it would add cost without adding evidence. The inspection plan for your programme is agreed before the first article, not adjusted afterwards.

Why do you not publish a defect rate?

Because a DPMO figure quoted without its measurement basis is not comparable between suppliers — counting method, inspection point and whether rework is netted out all change the number. We publish first-pass yield and on-time delivery with their definitions instead. If your supplier audit requires an outgoing-defect number, we will agree the definition with you and report against it.

How is Class 2 or Class 3 decided?

By the product and by you, at quotation. Class 3 tightens the voiding limits under IPC-7095, the through-hole fill requirements under IPC J-STD-001 and the appearance criteria under IPC-A-610, which raises inspection time and rework cost. Most industrial and consumer programmes are designed to Class 2, while medical, automotive and high-reliability products often specify Class 3. We apply the class written on the order.

Inspection evidence

The joints you cannot see are the ones that decide the build

In-line X-ray inspection cabinet with its leaded viewing door and a console showing a scanned ball-grid array image

IN-LINE X-RAY · 2D transmission imaging of hidden joints

What this station proves

Equipment is only half of an inspection claim; the other half is what gets written down. Each station below feeds a record tied to the board serial and the process lot it came from.

Softly lit out-of-focus circuit board surface with faint copper traces and via pads

Next step

Send your audit checklist with the Gerbers

Tell us the IPC class your product is designed to, the packages that need X-Ray, and the test coverage you expect. The quotation comes back with the acceptance criteria, the assembly lead time ex-components and the documentation pack stated line by line.

Reply within one business day

Quality agreements, signed NDAs and IQ/OQ/PQ documentation packages are prepared by the same team that owns the inspection plan.