Skip to main content
Hand-soldering and rework bench with a mixed-technology board in its fixture, a fine-tipped iron in the holder and a magnification lamp

MIXED-TECHNOLOGY · ONE WORK ORDER

One board, three processes, one work order.

Reflow, press-fit and hand soldering run as one sequence on 7 SMT and 2 THT lines at one Shenzhen site. The joint class is locked before the line is set and the stencil is cut.

PROCESS ORDER

Six steps, and the order is not negotiable

A mixed-technology board fails on sequence far more often than on machine capability. This is the order every mixed work order follows, and the control point that is signed off at each step.

Three inputs are enough for a first-pass route

Layer count, through-hole joint count and the acceptance class tell us whether selective, wave, press-fit or pin-in-paste is the right route — and the sequence it imposes.

DFM / DFA review — joint class locked

IPC-A-610 Class 2 or Class 3 is fixed here, before panelisation and before the stencil is cut. Class decides inspection configuration, staffing and the traceability package.

SMT first pass

Paste print → 3D SPI → placement → reflow. The highest-temperature process runs first, so every joint made afterwards stays below the reflow profile already applied.

Second-side SMT

Double-sided assemblies go back through a carrier or fixturing that supports the populated first side. Board thickness runs 0.4–4.0 mm.

THT insertion

Axial and radial auto-insertion for high-volume passives, hand insertion for connectors, and press-fit for compliant-pin parts. Insertion force is set by the tooling, not by the operator.

Through-hole soldering

Selective soldering for localised heat, dual-wave with a pallet for high hole counts, hand soldering for connectors and rework. The choice is made per joint, not per board.

Inspection & test

AOI, X-ray to IPC-7095 void criteria, ICT or FCT, and an FAI record with SPI and AOI data. Inspection items are configured per project.

Hand-soldering and rework bench with a mixed-technology board in its fixture, a fine-tipped iron in the holder and a magnification lamp

WHY THE ORDER IS WHAT IT IS

Highest temperature first, everything else second

Through-hole soldering happens after SMT reflow, so joints that are already made have to survive a second thermal cycle. That single constraint sets the sequence.

Reflow first, THT second

Reversed, the through-hole joints would be re-melted by the paste reflow profile. Running SMT first means the second excursion is the smaller of the two, and it is bounded by the J-STD-020 ceiling rather than by the solder alloy alone.

Selective soldering keeps the heat local

A single-point nozzle at 260–280 °C (lead-free, industry-typical) heats the joint in front of it and leaves neighbouring SMT parts alone. That is the reason mixed boards use selective rather than wave, not the positional accuracy.

Wave soldering heats the whole board

Lead-free wave runs 255–265 °C (industry-typical) across the full assembly, so the SMT side has to be masked by a pallet. Pallet tooling is USD 3,000–8,000 per design, and V-CUT depaneling then requires board thickness of at least 0.8 mm.

MSL exposure is re-checked before the second pass

Moisture-sensitive parts are re-counted against their floor-life budget before through-hole soldering. Parts that exceed the budget are baked before the second excursion; barrier bags, desiccant and humidity indicator cards follow the same flow as component sourcing.

PARAMETER WINDOW

The mixed-technology window in fifteen rows

Every row below is either a standard we work to, a machine parameter, or an industry-typical figure. The basis column says which.

Mixed-technology parameter window
Parameter Value Basis
Work order scope SMT reflow, press-fit and hand soldering inside one work order and one traceability record Verified
Process order SMT before THT — the highest-temperature process runs first Standard practice
Joint class IPC-A-610 Class 2 or Class 3, locked before panelisation and before the stencil is cut IPC-A-610
Through-hole fill To IPC J-STD-001: Class 2 requires ≥75% barrel fill on the solder side; Class 3 requires 100% circumferential wetting plus ≥75% fill and a visible fillet IPC J-STD-001
Wave versus selective defect rate Wave 500–2,000 PPM against selective 50–200 PPM on mixed assemblies Industry-typical
Selective nozzle temperature 260–280 °C lead-free, single-point localised heating Industry-typical
Wave solder temperature 255–265 °C lead-free, whole-board heating Industry-typical
Second thermal cycle Peak must stay below the 260 °C absolute ceiling of IPC/JEDEC J-STD-020 J-STD-020
Press-fit Solderless compliant-pin insertion, insertion force controlled by the press tooling Verified
Pin-in-paste Requires 2–3× the normal paste volume, delivered by a stepped stencil or print-plus-dispense Industry-typical
Board thickness 0.4 – 4.0 mm for assembly Line capability
Depaneling V-CUT requires board thickness ≥0.8 mm; routing is the alternative; breakaway rail ≥5 mm Panel rules
Tooling Pallet or carrier USD 3,000–8,000 per design; selective-solder programming USD 500–1,000 Industry-typical
Real cost of Class 3 Assembly cost +20–40%, line speed −20–40%, defect rate 2–5% rising to 8–15%, full inspection and a complete traceability package, restricted rework Industry-typical
Line ownership 7 SMT lines and 2 THT lines in the same plant, on the same work order Verified

THERMAL BUDGET

Three numbers decide whether your reflowed parts survive the THT pass

Reflow first, THT secondSecond excursion bounded by J-STD-020
Selective nozzle 260–280 °C, localisedOne joint at a time
Peak ceiling 260 °C per J-STD-020Absolute, applies to every component on the board
Wave 255–265 °C, whole boardRequires a masking pallet over the SMT side
MSL floor life re-counted before the second passOver budget → bake before THT soldering

The ceiling is a component limit, not a process preference. A board that mixes a 0.4 mm-pitch BGA with a press-fit backplane connector can hold both, but only if the through-hole heat stays under the same 260 °C peak the reflow profile already respected.

WHAT ONE WORK ORDER COVERS

Six operations inside a single build package

Traceability

One work order, one record

SMT, press-fit and hand soldering post to the same work order and the same lot record, so a returned board resolves to one build history instead of three suppliers' paperwork.

Quality & inspection

Solderless

Press-fit

Compliant-pin connectors are pressed with controlled force and a support fixture. No solder joint means no solder-joint defect class for that connection.

Through-hole & DIP

Single pass

Pin-in-paste

Through-hole parts reflow together with the SMT side using 2–3× the paste volume, delivered by a stepped stencil or print-plus-dispense. Best when hole count per board is low.

SMT assembly

Per joint

Three through-hole methods

Selective for localised heat, dual-wave behind a pallet for dense connector fields, hand soldering for rework and for parts that cannot take either. Allocation is decided joint by joint.

Through-hole & DIP

Double-sided

Two reflow passes, one carrier

The second side runs on a carrier that supports the populated first side. Board thickness from 0.4 mm; the same pallet logic protects the assembly in the THT pass that follows.

All capabilities

Fixed before tooling

Class locked, line not re-tuned

Changing class mid-build means re-cutting the stencil parameters, re-programming selective soldering and reconfiguring inspection. That is why the class is fixed at DFM, not at first article.

Design & DFM guides

TOOLING, LEAD TIME, MINIMUM ORDER

What the sequence costs and how long it takes

Commercial parameters for mixed-technology builds
Item Figure Note
Minimum order Chip passives 0603–2225 / SOT / SOD / MELF: 50 pcs + 30 spares. Other packages: 100 pcs + 50 spares. Set by the component package and its reel economics; prototype quantities are quoted per project.
Prototype build 1–10 pcs in 3–7 working days Assembly lead time ex-components.
Small batch 10–1,000 pcs in 5–10 working days Assembly lead time ex-components.
5,000 pcs Approximately 3 weeks Assembly lead time ex-components; not a general volume lead time.
Production, components in hand 3–4 weeks ex-works 3–4 weeks ex-works, then assembly lead time ex-components.
Long-lead semiconductors Can add 12–26 weeks Industry data. The bottleneck sits in the BOM, not on the line.
Unit premium, 5–20 pcs +30–40% on unit price Stencil, programme, first article and changeover time spread over very few boards.
Unit premium, 101–499 pcs +5–15% on unit price Same setup, more boards to carry it.
NRE Commonly USD 0–150, waived on most projects Quoted with the build, not treated as a separate profit line.
Pallet or carrier USD 3,000–8,000 per design Industry-typical. Masking apertures are cut for your specific SMT layout.
Selective-solder programming USD 500–1,000 Industry-typical. One programme per board design.
Economic sweet spot Selective wins below roughly 5,000 pcs per batch; wave wins above roughly 10,000 pcs per batch Industry-typical, measured on a typical mixed board with around 20 through-hole joints.

MATERIALS AND CONSUMABLES

Four choices you specify, we tool for

Fixture

Pallets and carriers

Composite pallets with apertures cut to mask the SMT area while the through-hole joints are exposed. USD 3,000–8,000 per design (industry-typical); at least 0.8 mm board thickness if you also want V-CUT depaneling.

Nozzle and press

Selective nozzles and press-fit tooling

Single-point selective nozzles running 260–280 °C lead-free, plus compliant-pin insertion tooling and a support fixture that sets insertion force and keeps the board flat under the press.

Alloy

Alloy and flux

SAC305 lead-free is the default. The wave section uses spray fluxing with a preheat zone. Lead-free wave baths generate 30–50% more dross than tin-lead (industry-typical), which is a maintenance cost, not a quality difference.

Masking

Masking and fixture consumables

High-temperature masking tape and fixtures, carrier locating pins, and the moisture-barrier packaging set — barrier bag, desiccant and humidity indicator card — that closes out the lot.

Consumable choices are recorded on the work order, and component-level questions route through component sourcing while test coverage is configured with testing & inspection.

HOW YOU VERIFY THE CLASS

Locked at DFM, checked against named standards

Class written into the work order

The joint class is recorded on the work order and the operator instructions before panelisation, so it is a build input rather than an inspection opinion.

Named acceptance standards

Visual acceptance to IPC-A-610 Class 2 / Class 3, process requirements to IPC J-STD-001, rework to IPC-7711/7721.

BGA void criteria to IPC-7095

Class 2 allows ≤25% single void and ≤40% total; Class 3 allows ≤10% single and ≤25% total, measured by X-ray on the joints the project designates.

Cleanliness and management system

Ionic contamination by ROSE to IPC-TM-650 Method 2.3.25: ≤1.56 µg NaCl eq/cm² at Class 2 and ≤0.78 at Class 3, under ISO 9001:2015, IATF 16949:2016 (product design excluded) and ISO 13485:2016, whose scope is Production of PCBA.

CASE EVIDENCE

What changed on a six-layer power board

Nordic EV charging module brand · 6-layer power board

Selective soldering replaced hand touch-up

A Nordic EV charging module brand had a 6-layer, 3 oz power board whose through-hole joints were being hand-soldered after reflow. Rework rate on those joints was 4.1%.

We moved the joints to robot selective soldering with a programmed single-point nozzle and a support fixture, keeping the through-hole heat localised so the reflowed SMT parts on the same board were untouched.

Joint rework rate4.1% → 0.3%
Copper weight3 oz
Process changeHand solder → selective

Anonymised: customer type, region, constraint, result.

REQUEST A QUOTE

Send the board, the BOM and the joint class

Layer count, through-hole joint count, connector type and the acceptance class are enough for us to tell you whether selective, wave, press-fit or pin-in-paste is the right route — and what it costs.

Reply within one business day

Mixed-technology quotes are priced from your files, volume and acceptance class.